If you’re planning a kitchen remodel, bathroom renovation, or home addition in Portland, one question matters before you do anything else: does this project require a permit? The answer determines your legal liability, your insurance coverage, and whether your home can be sold without complications later. This guide tells you exactly what requires a permit in Portland and Beaverton, what the process looks like, and what happens if you skip it.
Yes, any residential remodel in Portland involving structural changes (removing walls, adding beams), moving or adding electrical circuits, altering plumbing lines, or converting basements into living space requires permits from Portland BDS or Washington County LUT. Simple like-for-like cosmetic updates (such as swapping cabinet doors, painting, or changing fixtures in the exact same location) do not require a permit.
Permit Requirements at a Glance
| Project Type | Permit Required? | Issuing Authority | Notes |
|---|---|---|---|
| Kitchen remodel (layout change) | Yes : Building + Electrical + Plumbing | Portland BDS / Washington Co. LUT | Required whenever plumbing or electrical is moved |
| Kitchen remodel (cosmetic only) | No | : | Cabinet swap, paint, hardware : no structural/MEP change |
| Bathroom addition (new fixture) | Yes : Full trade permits | Portland BDS | New drain, vent, supply lines always require permit |
| Load-bearing wall removal | Yes : Structural + Building | Portland BDS | Stamped engineer calculations required |
| Basement finish (habitable space) | Yes : Building + Electrical + Mechanical | Portland BDS | Egress window required for bedrooms (ORSC R310) |
| Deck addition (>30″ above grade) | Yes : Building | Portland BDS | Footings and ledger connection inspected |
| Water heater replacement | Yes : Plumbing/Mechanical | Portland BDS | Simple over-the-counter permit |
| Like-for-like fixture replacement | No | : | Same-location toilet swap, faucet change : no permit |
Portland BDS vs. Washington County (Beaverton)
| Factor | Portland BDS | Washington County LUT (Beaverton) |
|---|---|---|
| Online submittal portal | DevHub PDX | MyPermitNow / County portal |
| Standard plan review time | 4–8 weeks (structural) | 3–6 weeks |
| Over-the-counter permits | Same-day for simple trades | Same-day for simple trades |
| Structural engineering required | Yes : for beam/wall work | Yes : for beam/wall work |
| FIR (First Issued for Review) | Available through DevHub | Not available : full set required |

Permit Fee Schedule (Portland Metro, 2026)
| Permit Type | Typical Fee Range | Fee Basis |
|---|---|---|
| Building : Kitchen/Bath remodel | $600: $1,800 | Project valuation |
| Electrical : New circuits | $200: $600 | Per circuit/fixture count |
| Plumbing : Rough + trim | $250: $750 | Per fixture count |
| Mechanical : Range hood / HVAC | $150: $450 | Per unit/BTU |
| Structural : Addition/beam | $1,200: $3,500 | Project valuation + sq ft |
Key Oregon Code References
- ORSC Section R301 : Structural design criteria for residential construction
- ORSC Section R310 : Emergency escape and rescue (egress window) requirements
- ORS 105.464 : Seller’s duty to disclose unpermitted work in real estate transactions
- AFCI/GFCI : All kitchen countertop receptacles require dual Arc-Fault and Ground-Fault protection per current Oregon code
- 400 CFM makeup air rule : Range hoods exhausting >400 CFM require makeup air supply
Consequences of Skipping Permits
| Risk | Impact |
|---|---|
| ORS 105.464 disclosure liability | Must disclose to buyers; can void sale or trigger renegotiation |
| Insurance denial | Homeowner’s insurance may deny claims for unpermitted work |
| Retroactive permit + stop-work | City can require demolition to inspect hidden work |
| Fine schedule | Double or triple permit fee plus reinspection costs |
| Lender issues | HELOC or refinance appraisal may flag unpermitted additions |
Portland’s Bureau of Development Services now accepts permit applications through DevHub PDX. Structural projects can submit for FIR (First Issued for Review) status, allowing construction to begin on approved portions while remaining plan check items are resolved : significantly reducing wait time for large kitchen and addition projects.
The Permitting Workflow: Step by Step
- Pre-application meeting : Confirm scope with BDS or Washington County. Free for most residential projects.
- Structural engineering : If removing walls or adding structure, retain a licensed Oregon structural engineer for stamped calculations.
- Permit set drafting : Architectural drawings, electrical schematics, plumbing riser diagrams, Title 33 site plan.
- Online submittal via DevHub PDX : Upload full plan set. Pay initial review fee. Receive assignment to plan examiner.
- Checksheet response : Respond to city’s technical questions in writing within 180 days of issue date.
- Permit issuance : Permit issued and posted on-site. Construction may begin.
- Rough-in inspections : Framing, plumbing, electrical, and mechanical inspections before wall closure.
- Final inspection : All trades sign off; certificate of occupancy issued for new habitable spaces.
PDX Remodeling & Design (Oregon CCB #216654) manages the full permitting workflow for every project. Call us at (971) 216-3854 to schedule a pre-application consultation.
PDX Remodeling & Design provides turnkey design-build excellence backed by our 2-year craftsmanship warranty and licensed Oregon expertise (CCB #216654).
Schedule a Free Consultation



